Schedule for the period of 2002-2006 of the local government of Pusztamagyaród

1. Industrial park and power plant establishment

Draft project:
The industrial park focuses on especially enterprises occupied in wood- processing. Local conditions, wide range of basic materials, traditions and labour force give grounds for establishing a new industrial park. There is quite a good base for the cooperation between the enterprises. Running the park with the cooperation of the specialized small-and medium-sized enterprises would stimulate high-quality and high-processed production. Inviting new firms running the same business can be advantageous for recycling industry. The new biomass (primarily wood)-based power station will be able to recycle all the waste wood materials of the enterprises. With the heat energy we will supply the enterpises and the local inhabitants, as well. A new project is badly needed to stop migration, to create new jobs, to establish new industries, while the new district heating system stimulates tourism.

Estimated total expenses: 900,000,000 HUF

Financial sources:

First phase: PHARE CBC (Hungary- Austria Small Project Fund)
90% EU-assistance
10% own resources (local government, enterprises)

Second phase: PHARE-ORPHEUS
50% EU-assistance
40% governmental assistance
10% own resources (local government, enterprises)

Expected date of fulfilment: 2004-2006


2. Rented-flat building plan


Draft project:
Target is ten new flats to be built by the local government. The government now owns only one flat. The new flats will contribute to keep the intellectuals in the settlement and to invite new experts here that is the industrial developments are aimed at. The flats are to be built on a building site owned by the local government.

Estimated total expenses: 165,000,000 HUF

Financial sources: Hungarian rented-flat program

Expected date of fulfilment: 2004


3. Sanitary centre establishment

Draft project:
The present sanitary centre was built in the middle of the 1960's. Now it is not in a good condition so reconstruction is badly needed. Due to its small size enlargement should be carried out. After the reconstruction the building and the equipment will meet all the requirements regulated by the law and the EU. According to the plans the building will be enlarged with a small room suitable for the reception of patients and the plumbing and heating system will be modernised, as well.

Estimated total expenses: 16,935,000 HUF

Financial sources: Regional Development Council of Zala County (under invitation-to-tender procedure)
West- Transdanubian Council of Regional Development

Expected date of fulfilment: 2003

4. Social care centre

Draft project:
We put big emphasis on taking care of the aging population; 172 people from the 699 are elder than 60, which is 24% of the total population. There are a lot of widows and widowers, disabled people, who need not only boarding but cultural programs and moving in society, as well. By modernising the building, which is free from Monday to Friday, we are able to fulfil all the necessary social requirements. Our social program and the new care centre with skilled social workers and a manager will be suitable to ensure boarding, regular medical check once a week and cultural programs for 30 people. For launching our program we need all the necessary equipment, furniture in the centre beyond modernising it.

Estimated total expenses: 35,000,000 HUF

Financial sources: Ministry of Health

Expected date of fulfilment: 2003-2004


5. New gymnasium plan

Draft project:
The aim of the plan is enlarging the primary school with a new gymnasium. In case of bad weather only a small room is suitable for PE lessons now. The new gym will be suitable not only for teaching but can give place for various sport programs for the local residents as well as people from the neighbour villages.

Estimated total expenses: 118,000,000 HUF.

Financial sources: tender under the supervision of the Ministry of Children, Youth and Sports, Regional Development Council of Zala County (own resources replaced by credit)

Expected date of fulfilment: 2004

6. Public House Plan

Draft project:
The former culture house, built in the 1950's, with the cinema functioned as a centre of entertainment in the village. Being in so critical condition it was destroyed in 2000 giving place to the new school. The new public house would serve as a culture house, as well. According to our plans the former Jewish commercial house standing on the corner of Fő street, which is now regarded as a monument, will be reconstructed on the one hand to ensure entertainment facilities for the youth and elder generations, on the other hand to give place to some civil organizations.

Expected date of fulfilment: 2005

7. Publication of local history monograph

Draft project:
Szakony Miklós, the freeman of our village has done some research on the local history for decades. We would like to publish a book from the data he collected. The book will give a description of the 900-year-history of our village.

Expected date of fulfilment: 2005


8. Watershed development at the boundary of Pusztamagyaród


At the boundary of Pusztamagyaród we can find some natural magic that the local people call watershed. Here are the springs of Alsó-Válicka and Felső- Válicka brooks. The catchment area of river Zala is toward north, toward south there is the catchment area of river Mura. We are to exploit all the advantages of the nature to make our village as a centre of local tourism and join to the Hungarian network by showing the watershed and our local values.

Expected date of fulfilment: 2005


9. Sewerage system establishment


10. Reconstruction and enlargement of nursery school


Draft project:
The nursery school operates in a 150-year-old mansion. The expert's study states for lack of insulation the walls are always humid due to soil humidity. Owing to the plaster the water cannot leave outside only inside the building. As a consequence all the walls are humid causing unhealthy, stuffy air. The floor was made of wood, it is in critical condition as well as the roof. There is an urgent need for functional and structural reconstruction.

Estimated total expenses: 118,000,000 HUF

Expected date of fulfilment: 2004